STATUS REPORT AND PROJECT SCHEDULE

After obtaining the node connectivity approval from the regional power grid operator (ELECTRICARIBE, November 20, 2012) and the node connectivity approval from the government's main energy agency (UPME unit, January 18, 2013), the project has achieved its most critical milestones and green lights for development. Together with the closing and acquisition of 10-hectares of rural land, the granted environmental permit in November 8, 2013 and the government approval of the phase 3 final registry by the UPME agency (http://www1.upme.gov.co/) in January 28, 2014, the project achieved full clearance to begin the development phase, and construction was started on September 8, 2014 following engineering designs and the master schedule as illustrated below. Up to date, the project has achieved a 20% development for the construction phase and is expected to begin commercial operation on June 2018.Cronograma general proyecto 30 01 2018

Visual Report for The Power House (Generation Building) Construction. AWARALA 12 2014

Visual Report for the Fire Blockage Wall Construction. AWARALA 12 2014

Visual Report for the Electric Substation Construction. AWARALA 12 2014

Visual Report DRONE. AWARALA 04 2015

Visual Report DRONE. AWARALA 06 2015

Visual Report. AWARALA 07 2015

Visual Report Construction Process. AWARALA 03 2017